Your project office, run by agents.

StructureGC is the system of record for a GC's jobs. A team of AI agents reads the inbox, files every email to the right job, updates the RFIs and submittals, and drafts the replies. Your PMs spend the day making calls instead of typing.

Built inside a working general contractor, on its own jobs.

My Day · PM Mon · Oct 5
3 things waiting on you
14 emails came in on your jobs. The agents handled 11.
Approve reply to the owner
26-902 · re: added scope, pricing request
Draft
Hi Greg, we'll price the hose bib and floor drain and confirm the schedule impact. Nothing proceeds until you approve.
ApproveEditReject
The agent has a question
26-901 · from the owner's email
Ask
Dana wants a date for furniture install. Nothing in the record says. What should I tell her?
Built by a GC, not for one Agents draft, people decide Every answer names its source
The problem

The job runs on email. Nobody was hired to file it.

RFIs, submittals, change requests, pay apps and owner questions all arrive in someone's inbox. The record lives in three other systems, and the people who know the job spend their day moving information between them.

Project managers

Buried in the inbox.

Every email has to be read, matched to a job, logged in the right place and answered. The decisions only a PM can make wait behind the filing.

Superintendents

Typing after the walk.

The day ends with a daily report, a punch list and photos to sort, and a call to the office to find out if the RFI ever came back.

Owners and executives

Finding out late.

The status of every job is spread across inboxes, spreadsheets and a PM system, so a stuck RFI or an unbilled month surfaces in a meeting, not the day it happens.

How it works

The inbox works itself. Nothing leaves without a person.

StructureGC's agents work the email the way a sharp project engineer would: figure out the job, update the record, tell the right person, and draft the reply for the PM to approve.

EmailFleet Electric: "Any update on RFI 6? We're about to be held up on classroom data drops."
ConductorWestport Charter School, 26-903. Routes it to the job's agent.
Job agentRFI #6 is still with the architect. Logs the follow-up, drafts a reply to Fleet, flags the delay to the super.
PMReads the draft, approves it. Done in one tap.
The agent team

Every email lands on the right job, with the work done.

A conductor agent reads each email and hands it to the agent for that job, or to estimating or compliance. They log RFIs and submittals, record change requests, track insurance certificates, alert the super, and draft the reply.

  • Replies stay drafts until the PM approves them
  • When an agent isn't sure, it asks, and the PM tells it what to do the way they'd direct an APM
  • Marketing and noise get set aside, not filed
Ask about this job
Why was the concrete mix design rejected?
Tom Kessler rejected submittal 03 30 00-1 on Oct 5: the proposed mix isn't equal to the specified product. English Concrete needs to resubmit the specified product.
Source · Tom Kessler's email, Oct 5 · Spec 03 30 00
Ask the job

Answers from the drawings, the specs and the email.

Ask a question in the field or the office, by typing, by voice or with a photo. StructureGC has read the drawings, spec book, RFIs, submittals, subcontracts and every email filed to the job, and every answer names the document it came from.

  • Knows what governs: an approved submittal beats an older drawing
  • Learns from new email as it's filed
  • An open RFI reads as open until the answer is actually in
Pay application #426-902
$2.29M
Contract sum to date
38%
Complete and stored
$43,600
Retainage held
$182,400
Due this period
Built from this month's sub progress
Draft
G702 and G703, line by line against the schedule of values
Sub pay app · Fleet Electric
Matched to the subcontract and its lien waiver
Held
Their certificate of insurance expired on Sep 30. The compliance agent has asked them for a new one.
Money in and out

The pay app starts itself, and nobody gets paid by accident.

StructureGC drafts the owner's G702 and G703 each month from subcontractor progress against the schedule of values. The PM adjusts it, an executive approves it, and the owner reviews, approves and signs it in their portal. Going the other way, every sub pay app is checked against its subcontract, its lien waivers and the sub's insurance before it's paid.

  • Retainage, change orders and previous certificates carried forward
  • A sub with expired insurance or a missing waiver is held, with the reason on the screen
  • Accounting sees what's owed, what's late and what's due to bill, on every job
In the field

The super walks the job. The paperwork comes back done.

In StructureGC Vision the super records the walk and talks through what they see. StructureGC writes the daily report, finds the punch items, reviews every photo for safety, and tracks each fix through to the sub.

StructureGC Vision 26-903
Today's report, from the walk
Draft
  • Level 2 east: drywall hung80%
  • Punch items found3
  • Questions for you2
Walk and talk

The daily report writes itself from the walk.

The super walks the site with a phone and narrates. Each morning StructureGC prepares the questions the camera can't settle, from what came in through the email and the records, and asks them after the walk. The report adds the day's facts from the record, which the super can untick.

  • On an iPhone Pro, the StructureGC app also records LiDAR depth and the phone's position, so walks can be placed on the floor plan and compared over time (in pilot)
  • Progress by area and trade, delays and their causes, in the super's own words
  • The drawings, specs and RFIs in their pocket, with Ask on every job
Corrective action26-901
Open edge at the mezzanine, no guardrail
From today's walk · photo attached
Serious
SubNorthside FramingFix byTomorrow, 9:40 AM
Unprotected sides and edges. Each employee on a walking/working surface (horizontal and vertical surface) with an unprotected side or edge which is 6 feet (1.8 m) or more above a lower level shall be protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems.29 CFR 1926.501(b)(1)
Send to the sub
Edit
Safety and quality

Every photo reviewed. Every hazard tracked until it's fixed.

StructureGC's Safety Officer reviews every walk and photo for hazards and quality defects. A serious hazard becomes a corrective action for the responsible sub, with the photo, what to do, a deadline, and the OSHA paragraph it breaks, quoted from the regulation itself.

  • Deadlines by severity: imminent danger in 4 hours, serious in 24, minor in 3 days
  • The super and PM are alerted at once to imminent danger
  • Fixes are verified by the super, late ones are chased, and repeat offenders are flagged to the PM
Punch list26-902
English Concrete · 6 items
PDF sent by email to their foreman, PM copied
Sent
  • DueThursday
  • Marked done by the sub2 of 6
  • Reminder if lateEvery 2 workdays
Close 2 items
Send back
Punch

Each sub gets its own list, and the reminders send themselves.

Punch items from the walks, the photos and the super come together on one list per job, matched to the right sub by trade. The super checks who gets what and sends each sub its PDF, by email or by text from their own phone.

  • Past-due items get a reminder every two workdays, then the PM and super hear about it
  • A sub's "done" by email is caught and waits for the super to close it or send it back
  • Closeout tracks warranties, final waivers, O&M manuals and as-builts against substantial completion
A city construction site at dusk: tower cranes, an excavator and high-rises against an orange sky

The super runs the site, the PM runs the paper, the owner runs the company. StructureGC keeps one record under all three.

Who it's for

Everyone on the team opens to their own day.

Same jobs, same record. What's on the screen depends on whose day it is.

Superintendents
Walk. Talk. Build.

Record the walk on a phone and get the daily report, the punch list and the safety review back, with the current drawings in their pocket.

  • RFI answers and returned submittals since the last walk
  • Punch lists to send, and corrective actions to verify, with the photos
  • What's holding up work that starts this week
In StructureGC Vision
Project managers
Decide.

The agents do the filing. The PM's day is the decisions: direct the agents, approve their drafts, and keep the money moving.

  • Agent questions with suggested instructions, and drafts to approve
  • Sub pay apps to review and the owner pay app's next step
  • Open RFIs and submittals by age, insurance about to lapse
  • The procurement log and closeout, against the dates that matter
In StructureGC PM
Owners and executives
See it all.

Every job on one screen, and only what needs an executive: what's wrong, what's waiting on whom, the money, and how the agents are performing.

  • Exceptions: across the jobs, only what's wrong, worst first
  • Reports as PDFs, for a project review or a handover while the PM is out
  • Contract, billed, owed and left to bill across the portfolio
  • One search across every job: records, email, documents, drawings and people
In StructureGC Command
You stay in control

Agents that work like a good APM, not a black box.

Nothing goes out unapproved

Every reply an agent writes is a draft. A PM reads it, edits it if needed, and approves it.

They ask when they're not sure

An agent that can't place an email or find a fact stops and asks, with the email attached and suggested instructions ready.

Every action is on the record

What each agent read, filed, changed and drafted is logged against the job, with who approved what and when.

Tested before your jobs see it

Agent changes run against a scripted week of real-world PM email with an answer key and are scored, with critical mistakes counted, before they reach a live job.

Checked against the record first

Before an RFI or a change event goes out, StructureGC checks whether the drawings, specs, an earlier RFI or a subcontract already answer it, and says where.

OSHA quoted, never paraphrased

Safety notices quote 29 CFR 1926 word for word from the regulation StructureGC keeps current, with the link, not a summary from memory.

Book a demo

See it run on a week of a PM's email.

We'll walk you through StructureGC working a live inbox: the agents filing and drafting, a PM's day, a super's walk becoming the daily report and the punch list, and the owner's view. Thirty minutes, on your schedule.